Lighting and wash/wipe switch assembly - renewal

The procedure is identical to that described for the direction indicator switch, except for the additional removal and refitting of an earth lead (see illustration).

7.1 Lighting and wash/wipe switch assembly earth lead securing screw
7.1 Lighting and wash/wipe switch assembly earth lead securing screw (arrowed)

    See also:

    Switches - removal and refitting
    General 1 Disconnect the battery negative terminal before removing any switches. Pre-1986 models Wiper delay switch 2 Remove the switch knob and the bezel nut. 3 Withdraw the switch through the ...

    Front brake disc pad check (Every 6000 miles or 6 months)
    1 Place a mirror between the roadwheel and the caliper and check the thickness of the friction material of the disc pads (see illustration). If the material has worn down to the specified minimum ...

    Seat Spanish
    On 25 September 1941 Instituto Nacional de Industria (INI), literally National Institute of Industry was established as a Spanish state-owned industrial holding company to promote the development of S ...