Major operations requiring engine removal

The following operations can only be carried out after removing the engine from the vehicle:
a) Removal of the crankshaft main bearings b) Removal of the crankshaft

    See also:

    Fuel pump - removal and refitting
    Note: Refer to the precautions at the end of Section 1 before proceeding. Removal 1 The fuel pump is bolted to the underside of the car just to the rear of the fuel tank. For access raise and sup ...

    Fuel tank - removal and refitting
    The procedure is as described in Part A of this Chapter for carburettor engines. ...

    Rear anti-roll bar (Saloon, Hatchback and Estate models) - removal and refitting
    Removal 1 Loosen the rear roadwheel nuts, chock the front wheels, jack up the rear of the vehicle and support on axle stands placed under the side members. 2 Prise off the straps which connect th ...