Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Distributor - removal and refitting
    Contact breaker ignition system OHV engines Removal 1 Disconnect the leads from the spark plugs, spring back the retaining clips and lift off the distributor cap. 2 Disconnect the LT lead at the ...

    Idle Speed Control Valve (ISCV) - removal, cleaning and refitting
    Removal 1 Disconnect the battery negative lead. 2 Disconnect the valve wiring plug (see illustration). 12.2 Idle speed control valve - 1.6 EFI engine A Wiring plug B Securing bolts 3 Unscrew t ...

    Battery - testing and charging
    Note: Refer to the precautions at the end of Section 1 before proceeding. Standard and low maintenance battery - testing 1 If the car covers a small annual mileage it is worthwhile checking the s ...