Electrical fault finding - general information
Refer to Chapter 12.
See also:
Valve clearance adjustment - OHV and HCS engines (Every 12 000
miles or 12 months)
OHV engines
1 This operation should be carried out with
the engine cold and the air cleaner and rocker
cover removed.
2 Using a ring spanner or socket on the
crankshaft pulley bolt, turn the cran ...
Heater controls - removal and refitting
Removal
1 Disconnect the battery negative lead.
2 Remove the securing screws and unclip the
lower and upper steering column shrouds.
3 Remove the four securing screws and
withdraw the instrument ...
Major operations requiring engine removal
The following work can only be carried out
after removal of the engine from the car:
a) Crankshaft main bearings - renewal.
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitti ...
