Throttle cable - adjustment, removal and refitting
The procedure is similar to that described in Part A of this Chapter for carburettor engines.
See also:
Fuel injector - removal and refitting
Note: Refer to the precautions at the end of
Section 1 before proceeding. New injector
seals will be required on refitting.
Removal
1 Disconnect the battery negative lead.
2 Remove the air cleane ...
Alternator drivebelt check (Every 6000 miles or 6 months)
1 A conventional vee drivebelt is used to
drive both the alternators and water pump
pulleys on OHV and HCS engines, and the
alternator pulley only on CVH engines, power
being transmitted via a pul ...
Major operations possible with the engine in the car
The following work can be carried out
without having to remove the engine:
a) Timing belt - renewal.
b) Camshaft oil seal - renewal.
c) Camshaft - removal and refitting.
d) Cylinder head - remova ...
