Throttle cable - adjustment, removal and refitting

The procedure is similar to that described in Part A of this Chapter for carburettor engines.

    See also:

    Exhaust manifold - removal and refitting
    2.0 litre SOHC models 1 Refer to Chapter 4 Part A, Section 26, but note the following points. 2 Ignore the references to removal and refitting of the air cleaner and hot air pick-up pipe, and not ...

    Fuel system - depressurising
    Warning: The fuel system will remain pressurised after the engine is switched off. Comply with relevant safety precautions during this operation and refer to the “Safety First” Section at the beg ...

    Major operations requiring engine removal
    The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal . b) Crankshaft - removal and refitting. c) Flywheel - removal and refitt ...