Clock - removal and refitting

Facia mounted clock Removal
1 Remove the instrument panel (Section 9).

2 Undo the screws around the edge of the instrument panel at the rear and separate the two panel halves.

3 Undo the nuts and remove the clock.

Refitting
4 Refitting is a reversal of removal.

Roof mounted clock
Removal
5 Disconnect the battery negative terminal.

6 Extract the two screws which hold the clock to the header panel.

7 Disconnect the clock and courtesy lamp wiring plug.

8 Detach the lamp from the clock.

Refitting
9 Refit by reversing the removal operations.

Once the battery is reconnected, the time must be re-set.

    See also:

    Crankcase ventilation system check (Every 12 000 miles (20 000 km) or 12 months)
    1 Inspect the crankcase ventilation system for blockage or damage. A blocked hose can cause a build-up of crankcase pressure, which in turn can cause oil leaks (see illustration). 35.1 Loosenin ...

    Oil pump - dismantling, inspection and reassembly
    1.8 litre (R2A type) 1 If oil pump wear is suspected, check the cost and availability of new parts and the cost of a new pump. Examine the pump as described in this Section and then decide whethe ...

    Cylinder head - removal and refitting (engine removed)
    Note: New cylinder head bolts, a new cylinder head gasket, a new timing chain tensioner plunger assembly, a new upper timing chain cover gasket, and a new camshaft cover gasket and reinforcing sle ...