Diagram 1a: 1986-on Starting, charging, and ignition (except fuel injection) all models
Diagram 1a: 1986-on Starting, charging, and ignition (except fuel injection)
all models
See also:
Major operations requiring engine removal
The following work can only be carried out
after removal of the engine from the car:
a) Crankshaft main bearings - renewal .
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitt ...
Front wheel bearings - renewal
1 Remove the hub carrier.
2 Reverse the roadwheel nuts and screw
them fully onto the studs to protect the
threads, then mount the hub carrier assembly
in a vice as shown (see illustration).
6.2 ...
Oil pump - removal and refitting
Removal
1 Remove the sump.
2 Unscrew the bolt securing the pick-up tube
and strainer to the cylinder block (see
illustration).
30.2 Unscrewing the oil pick-up tube securing bolt
3 Using a suit ...
