Engine/manual gearbox assembly - reconnection and refitting

1 Reverse the procedure described in Section 11, noting the following points.

2 Before attempting to reconnect the engine to the gearbox, check that the clutch friction disc is centralised. This is to ensure that the gearbox input shaft splines will pass through the splines in the centre of the friction disc.

mobile detailing

3 Check that the clutch release arm and bearing are correctly fitted, and lightly grease the input shaft splines.

4 Check that the engine adapter plate is correctly positioned on its locating dowels.

5 Refit the propeller shaft.

6 Refit the exhaust system.

7 Reconnect the clutch cable to the release arm, ensuring that it is routed as noted during removal.

8 Fill the engine with the correct grade and quantity of oil.

9 Fill the cooling system.

10 Check and if necessary top-up the gearbox oil level.

11 Check and if necessary adjust the tension of the alternator and where applicable the power steering pump drivebelt(s).

12 Adjust the throttle cable.

    See also:

    Major operations requiring engine removal
    The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal. b) Crankshaft - removal and refitting. c) Flywheel - removal and refitti ...

    Crankshaft and bearings - examination and renovation
    1.8 litre (R2A type) 1 Examine the bearing surfaces of the crankshaft for scratches or scoring and, using a micrometer, check each journal and crankpin for ovality. Where this is found to be in e ...

    Specifications
    System type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Diagonally split dual circuit, hydraulic with pressure regulating valve to rear brakes. Servo ass ...