Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Door lock - removal and refitting
    Models up to 1990 1 Remove the door inner trim panel. 2 Where necessary for improved access, peel back the waterproof plastic sheet from the door. 3 Withdraw the window channel extension through ...

    Manual gearbox oil level check (Every 12 000 miles (20 000 km) or 12 months)
    1 Place the vehicle over a pit, or raise and support it at front and rear. The vehicle must be level for an accurate check. 2 If the gearbox is hot after a run, allow it to cool for a few minutes. ...

    Diagram 4b: 1986-on KE-Jetronic fuel injection
    Diagram 4b: 1986-on KE-Jetronic fuel injection For starting and charging circuits see Diagram 1a ...