Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Oil pump - removal and refitting.
See also:
Facia panels - removal and refitting
Models up to 1992
1 Note the locations of the facia panel
securing screws (see illustration).
43.1 Facia panel securing screw locations (arrowed)
A Upper facia panel
B Passenger side lower faci ...
Cylinder head - removal and refitting
Removal
Note: On HCS engines, cylinder head bolts
may be used a total of three times (including
initial fit) and must be suitably marked to
indicate each removal operation. A new
cylinder head ga ...
Air filter maintenance
Refer to the scheduled maintenance guide for the appropriate intervals
for changing the air filter element.
When changing the air filter element, use only the Motorcraft air filter
element listed ...
