Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Oil pump - removal and refitting.
See also:
Flywheel/driveplate - removal, inspection and refitting
Note: New flywheel securing bolts must be
used on refitting.
1.8 litre (R2A type)
1 Refer to Section 26, Chapter 2, Part A but
also note the following points.
2 The flywheel/driveplate securing b ...
Initial start-up after overhaul or major repair
1 Make a final check to ensure that
everything has been reconnected to the
engine and that no rags or tools have been left
in the engine bay.
2 Check that oil and coolant levels are
correct.
3 S ...
Speedometer cable - removal and refitting
Removal
1 On models fitted with a trip computer,
remove the speed sender unit.
2 Remove the instrument panel.
3 Pull the cable through the bulkhead into the
engine compartment, and where applicab ...
