Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Oil pump - removal and refitting.
See also:
Throttle body - removal and refitting
Note: A tachometer and an exhaust gas
analyser will be required to check the idle
mixture on completion. A new gasket must be
used when refitting the throttle body.
2.0 litre SOHC models
1 Discon ...
Fuel and exhaust systems - fuel injection
General information and precautions
General information
2.0 litre SOHC models
The fuel injection system fitted to these
models is of the Bosch L-Jetronic type. The
system is under the overall con ...
Air cleaner inlet air temperature control check (Every 24 000 miles (40 000
km) or 2 years)
SOHC and DOHC carburettor
models
1 A vacuum pump will be required to test the
control components.
2 To check the operation of the air
temperature control, the engine must be cold.
First observe ...
