Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Oil pump - removal and refitting.
See also:
Engine valve clearance check (Every 12 000 miles (20 000 km) or 12 months)
SOHC engines
1 The valve clearances must be checked with
the engine cold. On carburettor models
remove the air cleaner.
2 Disconnect the HT leads from the spark
plugs and release them from the cl ...
Idle Speed Control Valve (ISCV) - removal, cleaning and
refitting
Removal
1 Disconnect the battery negative lead.
2 Disconnect the valve wiring plug (see
illustration).
12.2 Idle speed control valve - 1.6 EFI engine
A Wiring plug B Securing bolts
3 Unscrew t ...
Cylinder head - removal and refitting (engine removed)
Note: Up to early 1984, splined type cylinder
head bolts were used, and from early 1984,
size T55 Torx bolts were used. Torx type bolts
must always be renewed after slackening. The
two types of bo ...
