Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Oil pump - removal and refitting.
See also:
Transmission fluid
Checking automatic transmission fluid
Refer to your scheduled maintenance guide for scheduled intervals for
fluid checks and changes. Your transaxle does not consume fluid.
However, the fluid lev ...
Crankshaft front oil seal - renewal
Note: A new gasket will be required for
refitting if the old seal housing is removed
during this procedure.
1 Remove the timing belt and the crankshaft
sprocket.
2 If an oil seal removal tool is ...
Valve clearance adjustment - OHV and HCS engines (Every 12 000
miles or 12 months)
OHV engines
1 This operation should be carried out with
the engine cold and the air cleaner and rocker
cover removed.
2 Using a ring spanner or socket on the
crankshaft pulley bolt, turn the cran ...
