Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Cylinder head - removal and refitting (engine removed)
    Note: New cylinder head bolts, a new cylinder head gasket, a new timing chain tensioner plunger assembly, a new upper timing chain cover gasket, and a new camshaft cover gasket and reinforcing sle ...

    Timing chain and sprockets - removal and refitting
    Note: Refer to the warning at the beginning of Section 5 before proceeding. A suitable puller will be required to remove the crankshaft pulley. A new crankshaft pulley bolt, a new timing chain ten ...

    Door - removal and refitting
    Front door 1 On models with electric mirrors, electric windows, central-locking, door-mounted speakers, or “door ajar” sensors, remove the trim panel and disconnect the wiring inside the door. Wi ...