Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Oil pump - removal and refitting.
See also:
Seat belts - removal and refitting
Front seat belt stalk
1 Remove the front seat.
2 Detach the seat belt stalk from the seat by
removing the two Torx screws.
3 Refitting is a reversal of removal.
Front seat belt assembly
4 Where ...
Engine coolant renewal (Every 36 000 miles (60 000 km) or 3 years)
Caution: Before proceeding,
note the precautions given in
Chapter 3, Section 1.
1 Disconnect the battery negative lead.
2 It is preferable to drain the cooling system
with the engine cold. If thi ...
Cylinder head - removal and refitting (engine removed)
Note: The cylinder head bolts must always be
renewed after slackening, and a new cylinder
head gasket and camshaft cover gasket must
be used on refitting. If the engine has recently
run, the cylin ...
