Driving
See also:
Load apportioning valve (anti-lock braking system) - removal
and refitting
Note: Before starting work, refer to the
warning at the beginning of Section 3
concerning the dangers of hydraulic fluid.
Removal
1 Raise the car on a hoist or drive the rear of
the car up on ram ...
Load apportioning valve (P100 models) - adjustment
Models before mid-April 1989
1 The vehicle must be unladen, at normal
kerb weight (a full tank of petrol, but no driver
or load).
2 With the vehicle standing on its roadwheels,
remove the spring ...
Airflow meter - removal and refitting
Note: A tachometer and an exhaust gas
analyser will be required to check the idle
mixture on completion.
1 Disconnect the battery negative lead.
2 Depress the locking clip on the airflow
meter wi ...
