Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Camshaft - removal and refitting.

f) Timing gears and chain - removal and refitting.

    See also:

    Timing chain and sprockets - removal and refitting
    Note: Refer to the warning at the beginning of Section 5 before proceeding. A suitable puller will be required to remove the crankshaft pulley. A new crankshaft pulley bolt, a new timing chain ten ...

    Ford VV carburettor automatic choke components - removal, checking and refitting
    Bi-metal housing Note: A new gasket will be required on refitting. Removal 1 Disconnect the battery negative lead. 2 Remove the air cleaner as described in Section 2. 3 Release any pressure in ...

    Rear brake shoe lining check (Every 6000 miles or 6 months)
    1 Due to the fact that the rear brake drums are combined with the hubs, which makes removal of the drums more complicated than is the case with detachable drums, inspection of the shoe linings can ...