Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Camshaft - removal and refitting.

f) Timing gears and chain - removal and refitting.

    See also:

    Tie-rod end - removal and refitting
    Note: A balljoint separator tool will be required for this operation. Removal 1 Loosen the relevant front roadwheel nuts, apply the handbrake, jack up the front of the vehicle and support on axle ...

    Fuel injectors - removal and refitting
    Note: Refer to the precautions at the end of Section 1 before proceeding. New injector seals will be required on refitting. Removal 1 Disconnect the battery negative lead. 2 Depressurise the fuel ...

    Sunroof components - removal, refitting and adjustment
    Sunroof panel Removal 1 To remove this type of glass panel, pull the sun blind into the open position and have the sliding roof closed. 2 Wind the sliding roof handle in an anticlockwise directi ...