Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Camshaft - removal and refitting.

f) Timing gears and chain - removal and refitting.

    See also:

    Engine - removal leaving manual gearbox in vehicle
    Note: The air conditioning system should always be discharged by a Ford dealer or air conditioning specialist. Note: Refer to the warning in Section 8 before proceeding. A suitable hoist and lifti ...

    Automatic transmission brake band adjustment (Every 24 000 miles (40 000 km) or 2 years)
    Note: A brake band torque wrench - Ford tool No 17-005, or a conventional torque wrench and a splined socket of suitable size to fit the square section head of the adjuster screw(s) will be requir ...

    General information
    OHV engines The 1.1 litre and 1.3 litre OHV engines are of four-cylinder, in-line overhead valve type (hence OHV), mounted transversely together with the transmission, at the front of the car. Th ...