Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Camshaft - removal and refitting.

f) Timing gears and chain - removal and refitting.

    See also:

    Power steering pump - removal and refitting
    Note: New power steering fluid hose O-rings will be required when refitting. All engines except 1.8 litre (R6A) CVH and 2.0 litre DOHC 1 Place a suitable container under the power steering pump, ...

    Engine dismantling, examination, renovation and reassembly - general information
    Dismantling 1 It is best to mount the engine on a dismantling stand but if this is not available, stand the engine on a strong bench at a comfortable working height. Failing this, it will have to ...

    Exhaust emission control system components - removal and refitting
    Carburettor engines Spark delay/sustain valve Removal 1 Disconnect the vacuum lines at the valve and remove the valve from the engine. Refitting 2 When refitting a spark delay valve it must be ...