Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Camshaft - removal and refitting.
f) Timing gears and chain - removal and refitting.
See also:
Radiator fan - removal and refitting
All models except RS Turbo
Removal
1 Disconnect the battery negative terminal.
2 Disconnect the wiring plug at the fan motor
and unclip the wiring from the shroud.
3 On pre-1986 models the fan sh ...
Piston/connecting rod assemblies - removal and refitting
Note: A piston ring compressor tool will be
required for this operation.
Removal
1 Remove the cylinder head and the sump as
described in Sections 4 and 5 respectively. Do
not remove the oil pick- ...
Carburettor (Weber 2V type) - fast idle speed adjustment
1 This procedure does not apply to models
fitted with a carburettor stepper motor, for
which no adjustment is possible.
2 Check the idle speed and mixture. The idle
speed must be correct before at ...
