Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Camshaft - removal and refitting.

f) Timing gears and chain - removal and refitting.

    See also:

    Door lock - removal and refitting
    Models up to 1990 1 Remove the door inner trim panel. 2 Where necessary for improved access, peel back the waterproof plastic sheet from the door. 3 Withdraw the window channel extension through ...

    Ignition system component check (Every 24 000 miles (40 000 km) or 2 years)
    1 Before disturbing any part of the ignition system, disconnect the battery negative lead. 2 Identify and clearly mark all HT leads before disconnecting them from the spark plugs. 3 Refer to the a ...

    Mixture (CO) adjustment potentiometer - removal and refitting
    Removal 1 The potentiometer is located on the side of the left-hand suspension turret (see illustration). 17.1 Mixture (CO) adjustment potentiometer (arrowed) - 1.6 EFI engine 2 Disconnect the ...