Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Camshaft - removal and refitting.

f) Timing gears and chain - removal and refitting.

    See also:

    Valve clearance adjustment - OHV and HCS engines (Every 12 000 miles or 12 months)
    OHV engines 1 This operation should be carried out with the engine cold and the air cleaner and rocker cover removed. 2 Using a ring spanner or socket on the crankshaft pulley bolt, turn the cran ...

    Inlet manifold - removal and refitting
    SOHC models Removal 1 Disconnect the battery negative lead. 2 Partially drain the cooling system. 3 Remove the air cleaner. 4 Disconnect the coolant hoses from the automatic choke (where applica ...

    Auxiliary air device - removal and refitting
    K-Jetronic system Removal 1 Disconnect the battery earth lead. 2 Disconnect the wiring multi-plug and the two air hoses from the device which is located beneath the cold start valve (see illustra ...