Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Camshaft - removal and refitting.

f) Timing gears and chain - removal and refitting.

    See also:

    Disc pads - inspection and renewal
    Caution: Refer to the precautions in Section 1. Front disc pads 1 The disc pad friction material can be inspected for wear without removing the roadwheels. Working beneath the vehicle, insert a ...

    Air cleaner element renewal (Every 24 000 miles or 2 Years)
    Carburettor and Central Fuel Injection (CFI) models 1 To remove the air cleaner lid undo and remove the retaining screws or bolts on the top face of the lid (see illustrations). 34.1a Removing ...

    Crankshaft and main bearings - removal and refitting
    Note: A new crankshaft rear oil seal and a new rear oil seal housing gasket should be used on refitting. Removal 1 With the engine removed from the vehicle, remove the timing chain and crankshaft ...