Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Camshaft - removal and refitting.

f) Timing gears and chain - removal and refitting.

    See also:

    Rear wheel cylinder (drum brakes) - removal, overhaul and refitting
    Caution: Refer to the precautions in Section 1. Saloon, Hatchback and Estate models 1 Chock the front wheels, loosen the relevant roadwheel nuts, then jack up the rear of the vehicle and support ...

    Electrical fault finding - general information
    Note: Refer to the precautions given in “Safety first!” and in Section 1 of this Chapter before starting work. The following tests relate to testing of the main electrical circuits, and should not ...

    Radiator fan thermal switch - testing, removal and refitting
    Testing 1 The thermal switch is located on the side of the thermostat housing on early OHV engine models and in the thermostat housing cover on later OHV versions. On all CVH engines, the switch ...