Major operations possible with the engine in the car
The following work can be carried out without having to remove the engine: a) Timing belt - renewal.
b) Camshaft oil seal - renewal.
c) Camshaft - removal and refitting.
d) Cylinder head - removal and refitting.
e) Crankshaft front oil seal - renewal.
f) Sump - removal and refitting.
g) Piston/connecting rod - removal and refitting.
h) Engine/transmission mountings - removal and refitting.
See also:
General information
OHV engines
The 1.1 litre and 1.3 litre OHV engines are
of four-cylinder, in-line overhead valve type
(hence OHV), mounted transversely together
with the transmission, at the front of the car.
Th ...
Diagram 4a: 1984-86 KE-Jetronic fuel injection
Diagram 4a: 1984-86 KE-Jetronic fuel injection For starting and charging
circuits see Diagram 1 ...
Speedometer cable - removal and refitting
Removal
1 On models fitted with a trip computer,
remove the speed sender unit.
2 Remove the instrument panel.
3 Pull the cable through the bulkhead into the
engine compartment, and where applicab ...
