Speed sender unit - removal and refitting

The speed sender unit is similar to that used with the fuel computer described in Chapter 12.

    See also:

    Electrical fault-finding - general information
    Note: Refer to the precautions given in “Safety first!” and in Section 1 of this Chapter before starting work. The following tests relate to testing of the main electrical circuits, and should not ...

    Thermostat - removal, testing and refitting
    OHV engines Note: A new gasket must be used on refitting. Removal 1 Drain the cooling system as described in Chapter 1. 2 Slacken the clips and disconnect the hoses at the thermostat housing (se ...

    Road test (Every 12 000 miles or 12 months)
    Instruments and electrical equipment 1 Check the operation of all instruments and electrical equipment. 2 Make sure that all instruments read correctly, and switch on all electrical equipment in ...