Climate Controls

See also:

Exhaust manifold - removal and refitting
Removal 1 Disconnect the battery negative lead. 2 Remove the air cleaner and pull the hot air pick-up pipe from the exhaust manifold hot air shroud. 3 Remove the securing screws (1 screw on DOHC ...

Fuel injectors and injector delivery pipes - removal and refitting
Note: Refer to the precautions at the end of Section 1 before proceeding. It is important to note that each injection supply pipe connection in the distributor head has a screw adjacent to it. The ...

Road test (Every 12 000 miles (20 000 km) or 12 months)
Instruments and electrical equipment 1 Check the operation of all instruments and electrical equipment. 2 Make sure that all instruments read correctly, and switch on all electrical equipment in ...