Major operations possible with the engine in the car

The following work can be carried out without having to remove the engine: a) Cylinder head - removal and refitting.

b) Valve clearances - adjustment (see Chapter 1).

c) Sump - removal and refitting.

d) Rocker gear - overhaul.

e) Crankshaft front oil seal - renewal .

f) Pistons/connecting rods - removal and refitting.

g) Engine mountings - renewal.

h) Oil filter - removal and refitting.

I) Oil pump - removal and refitting.

    See also:

    Battery terminal check (Every 12 000 miles (20 000 km) or 12 months)
    Caution: Before carrying out any work on the vehicle battery, read through the precautions given in “Safety first!” at the beginning of this manual. 1 The battery fitted as original equipment is ...

    Vehicle loading
    Before loading a vehicle, familiarize yourself with the following terms: Base Curb Weight: Weight of the vehicle including any standard equipment, fluids, lubricants, etc. It does not include oc ...

    Crankcase emission control system components - removal and refitting
    Carburettor and Central Fuel Injection (CFI) engines 1 On OHV and HCS engines renewal of the vented oil filler cap and crankcase ventilation hoses is simply a matter of removing them from their l ...