The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Camshaft - removal and refitting.

f) Timing gears and chain - removal and refitting.

    See also:

    Driveshaft check (Every 12 000 miles or 12 months)
    1 Carry out a thorough inspection of the driveshafts and joints as follows. 2 Jack up the front of the car and support it securely on axle stands (see “Jacking and Vehicle Support”). 3 Slowly rot ...

    Cab interior trim panels (P100 models) - removal and refitting
    Side trim panel 1 Remove the rear pillar trim panel. 2 Remove the side trim panel by prising out the four expander pins from the clips, then pulling out the clips and withdrawing the panel. 3 Re ...

    Timing belt - removal, refitting and adjustment
    Removal Note: From April 1988 (build code JG) a modified timing belt tensioner incorporating a larger diameter tensioner roller was introduced, and from October 1988 an improved timing belt was u ...