Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Camshaft - removal and refitting.
f) Timing gears and chain - removal and refitting.
See also:
Specifications
Battery
Type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . 12 volt lead-acid, 35 to 52 Ah depending on model
Charge condition:
Poor . . . ...
Camshafts and cam followers - removal, inspection and refitting
Note: Once the timing chain has been
removed from the camshaft sprockets, do not
turn the crankshaft until the timing chain has
been correctly refitted - this is to prevent
contact between the val ...
Heater controls - adjustment
1 On heaters with lever control, set both
control levers approximately 2.0 mm up from
their lowest setting. On heaters with rotary
controls set the controls just off the COLD
and CLOSED positions. ...
