Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Camshaft - removal and refitting.
f) Timing gears and chain - removal and refitting.
See also:
Cylinder block and bores - examination and renovation
1 The cylinder bores must be examined for
taper, ovality, scoring and scratches. Start by
examining the top of the bores; if these are
worn, a slight ridge will be found which marks
the top of the ...
Fuel pressure regulator - removal and refitting
Note: Refer to the precautions at the end of
Section 1 before proceeding.
Removal
1 The fuel pressure regulator is only used on
KE-Jetronic systems and is located behind
the fuel distributor (see ...
Camshaft and cam followers - removal, inspection and refitting
Note: A new camshaft oil seal and new rocker
arm securing nuts should be used when
refitting.
1.8 litre (R2A type)
Removal
1 Remove the cylinder head.
2 Unscrew the securing bolts and remove the ...
