Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Camshaft - removal and refitting.
f) Timing gears and chain - removal and refitting.
See also:
Roadwheel check (Every 12 000 miles or 12 months)
Check the wheel rims for distortion,
damage and excessive run-out. Also make
sure that the balance weights are secure with
no obvious signs that any are missing.
Check the torque of the wheel bolt ...
Fuel tank - removal and refitting
The procedures are the same as described
in Part A of this Chapter for carburettor
engines, but in addition disconnect the fuel
tank-to-fuel pump hose from the rear face of
the tank. ...
Fuel system (1.6 and 1.8 litre (R6A type) CVH) - depressurisation
Remember to depressurise the
fuel system before loosening any
connections.
Refer to the precautions in
Section 1 before proceeding. The fuel
system will remain pressurised after the
engine is sw ...
