Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Camshaft - removal and refitting.

f) Timing gears and chain - removal and refitting.

    See also:

    General information
    The 1.1 litre, 1.3 litre, 1.4 litre and 1.6 litre CVH (Compound Valve angle, Hemispherical combustion chambers) engines are of four cylinder in-line overhead camshaft type, mounted transversely, t ...

    Fuel pump - removal and refitting
    Removal 1 The fuel pump is integral with the fuel level sender unit in the fuel tank (see illustration). 7.1 Integral fuel level sender unit/fuel pump - 1.4 CFI engine A Fuel pump B Sender unit ...

    Mixture adjustment check (Every 6000 miles (10 000 km) or 6 months)
    Caution: Refer to the precautions in Section 1, Chapter 4, Part A or B (as applicable), before proceeding. Before carrying out any carburettor adjustments, ensure that the ignition timing and sp ...