Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Camshaft - removal and refitting.
f) Timing gears and chain - removal and refitting.
See also:
Trailer towing
Your vehicle is capable of towing a trailer up to 454 kg (1,000 lbs.) gross
trailer weight with a maximum tongue load of 45 kg (100 lbs.). Do not
tow a trailer until your vehicle has been driven at ...
Engine/automatic transmission assembly - reconnection and refitting
1 Reverse the removal procedure described
in Section 12, noting the following points.
2 Check that the engine adapter plate is
correctly positioned on its locating dowels.
3 As the torque converte ...
Air cleaner - removal and refitting
The procedure is similar to that described in
Part A of this Chapter for carburettor engines. ...
