Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal .

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Camshaft - removal and refitting.

f) Timing gears and chain - removal and refitting.

    See also:

    Pistons and connecting rods - removal and refitting
    Removal 1 Remove the sump and the cylinder head. 2 Check the big-end bearing caps for identification marks and if necessary use a centre-punch to identify the caps and corresponding connecting ro ...

    Specifications
    System type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pressurised, pump-assisted thermo-syphon with front mounted radiator and electric cooling fan Pr ...

    Cylinder head - removal and refitting (engine in vehicle)
    Note: Refer to the note at the beginning of Section 20 before proceeding. 1.8 litre (R2A type) Removal 1 Disconnect the battery negative lead. 2 Drain the cooling system. 3 Disconnect the heater ...