Clock - removal and refitting

Facia mounted clock Removal
1 Remove the instrument panel (Section 9).

2 Undo the screws around the edge of the instrument panel at the rear and separate the two panel halves.

3 Undo the nuts and remove the clock.

Refitting
4 Refitting is a reversal of removal.

Roof mounted clock
Removal
5 Disconnect the battery negative terminal.

6 Extract the two screws which hold the clock to the header panel.

7 Disconnect the clock and courtesy lamp wiring plug.

8 Detach the lamp from the clock.

Refitting
9 Refit by reversing the removal operations.

Once the battery is reconnected, the time must be re-set.

    See also:

    Flywheel/driveplate - removal, inspection and refitting
    Note: New flywheel securing bolts must be used on refitting. 1.8 litre (R2A type) 1 Refer to Section 26, Chapter 2, Part A but also note the following points. 2 The flywheel/driveplate securing b ...

    Idle speed and mixture adjustment (Every 6000 miles or 6 months)
    Caution: Certain adjustment points in the fuel system are protected by “tamperproof” caps, plugs or seals. In some EEC countries (though not yet in the UK) it is an offence to drive a vehicle wit ...

    Power-operated folding roof - fluid level checking and bleeding
    General 1 As from 1987, a power-operated folding roof is available as an option on Cabriolet models. 2 The roof is operated hydraulically from an electric pump located in the left-hand side of t ...