Clock - removal and refitting
Facia mounted clock
Removal
1 Remove the instrument panel (Section 9).
2 Undo the screws around the edge of the instrument panel at the rear and separate the two panel halves.
3 Undo the nuts and remove the clock.
Refitting
4 Refitting is a reversal of removal.
Roof mounted clock
Removal
5 Disconnect the battery negative terminal.
6 Extract the two screws which hold the clock to the header panel.
7 Disconnect the clock and courtesy lamp wiring plug.
8 Detach the lamp from the clock.
Refitting
9 Refit by reversing the removal operations.
Once the battery is reconnected, the time must be re-set.
See also:
Fuel filter renewal - fuel injection engines (Every 24 000
miles or 2 Years)
Warning: This procedure may
result in some fuel spillage. Before
carrying out any operation on the
fuel system refer to the
precautions given in Safety First! at the
beginning of this manual and ...
Valve clearance adjustment - OHV and HCS engines (Every 12 000
miles or 12 months)
OHV engines
1 This operation should be carried out with
the engine cold and the air cleaner and rocker
cover removed.
2 Using a ring spanner or socket on the
crankshaft pulley bolt, turn the cran ...
Specifications
General
Engine type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . Four-cylinder, in-line overhead valve
Capacity:
1.1 litre:
OHV engines . . . . . ...
