Clock - removal and refitting
Facia mounted clock
Removal
1 Remove the instrument panel (Section 9).
2 Undo the screws around the edge of the instrument panel at the rear and separate the two panel halves.
3 Undo the nuts and remove the clock.
Refitting
4 Refitting is a reversal of removal.
Roof mounted clock
Removal
5 Disconnect the battery negative terminal.
6 Extract the two screws which hold the clock to the header panel.
7 Disconnect the clock and courtesy lamp wiring plug.
8 Detach the lamp from the clock.
Refitting
9 Refit by reversing the removal operations.
Once the battery is reconnected, the time must be re-set.
See also:
Camshaft and cam followers - removal, inspection and refitting
Note: A new camshaft oil seal should be used
when refitting the camshaft.
Removal
1 Remove the cylinder head.
2 Hold the camshaft stationary using a
suitable spanner on the cast boss behind the
...
Front brake disc - inspection, removal and refitting
Note: Before starting work, refer to the
warning at the beginning of Section 2
concerning the dangers of asbestos dust.
Inspection
1 Fully apply the handbrake then loosen the
front roadwheel bolt ...
Specifications
General
Engine type . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . Four-cylinder, in-line overhead valve
Capacity:
1.1 litre:
OHV engines . . . . . ...
