Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Cylinder head - dismantling and reassembly
    Note: A valve spring compressor will be required during this procedure. New valve stem oil seals should be used on reassembly. 1.8 litre (R2A type) Dismantling 1 With the cylinder head removed, ...

    Cylinder block and bores - examination and renovation
    1 The cylinder bores must be examined for taper, ovality, scoring and scratches. Start by examining the top of the bores; if these are worn, a slight ridge will be found which marks the top of the ...

    Radiator - removal and refitting
    Removal 1 Disconnect the battery negative lead. 2 Drain the cooling system. 3 If not already done, disconnect the bottom hose from the radiator. 4 Disconnect the top hose and the expansion tank ...