Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Oil pump - removal and refitting.
See also:
Initial start-up after overhaul or major repair
1 Make a final check to ensure that
everything has been reconnected to the
engine and that no rags or tools have been left
in the engine bay.
2 Check that oil and coolant levels are
correct.
3 S ...
Bonnet lock - removal and refitting
Removal
1 Extract the three securing screws from the
lock and lower it until the cable can be
disconnected.
2 Withdraw the lock from below the top rail.
Refitting
3 Refit by reversing the remova ...
Specifications
System type . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . 12 volt, negative earth
Bulbs Wattage
Headlamp:
Halogen . . . . . . . . . . . . . . . . . . . . . ...
