Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Brake components check (Every 36 000 miles or 3 years)
    1 Inspect the thickness of the friction linings on the disc pads and brake shoes (as described earlier in this Chapter) at the intervals specified. 2 The rigid and flexible hydraulic pipes and ho ...

    Windscreen and fixed window glass - removal and refitting
    Windscreen Note: The average DIY mechanic is advised to leave windscreen removal and refitting to an expert. For the owner who insists on doing it himself, the following paragraphs are given. Rem ...

    Boot lid (Saloon models) - removal and refitting
    Removal 1 Open the boot lid, and place protective covers (old rags or cardboard) beneath the corners of the lid, and over the rear wings to prevent damage to the paintwork. 2 Where applicable, di ...