Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Doors - removal and refitting
    Front door Pre-1986 models Removal 1 Open the door fully and support its lower edge on a jack or blocks covered with a pad of cloth to prevent scratching. 2 Unscrew the two bolts which hold the ...

    Fuel filter renewal - fuel injection engines (Every 24 000 miles or 2 Years)
    Warning: This procedure may result in some fuel spillage. Before carrying out any operation on the fuel system refer to the precautions given in Safety First! at the beginning of this manual and ...

    Airflow meter - removal and refitting
    Note: A tachometer and an exhaust gas analyser will be required to check the idle mixture on completion. 1 Disconnect the battery negative lead. 2 Depress the locking clip on the airflow meter wi ...