Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Timing belt - removal, refitting and adjustment
    Removal Note: From April 1988 (build code JG) a modified timing belt tensioner incorporating a larger diameter tensioner roller was introduced, and from October 1988 an improved timing belt was u ...

    Automatic transmission fluid level check (Every 12 000 miles or 12 months)
    1 The automatic transmission fluid level must be checked when the engine and transmission are at normal operating temperature; preferably after a short journey. 2 Park the car on level ground, the ...

    Manual steering gear - removal and refitting
    Note: A balljoint separator tool will be required for this operation. Removal 1 Set the front wheels in the straight-ahead position. Ensure that the steering lock is engaged and remove the igniti ...