Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Oil pump - removal and refitting
    Note: A suitable puller will be required to remove the crankshaft pulley. A new crankshaft pulley bolt, a new lower timing chain cover gasket, and a new oil pump gasket, must be used on refitting. ...

    Throttle valve control motor - removal and refitting
    Removal 1 Disconnect the battery negative lead. 2 Remove the air cleaner assembly. 3 Disconnect the wiring plugs from the motor and the throttle position sensor. 4 Remove the screws securing the ...

    Cylinder head and pistons - decarbonising
    1 With the cylinder head removed as described in Section 7, the carbon deposits should be removed from the combustion surfaces using a blunt scraper. Take great care as the head is of light alloy ...