Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Central door locking components - operation, removal and refitting
    Note: If a central locking solenoid or motor is to be renewed due to jamming or overheating, the central locking relay must be renewed at the same time even if it is believed to be working correct ...

    Crankcase emission control filter renewal - CVH engines (Every 24 000 miles or 2 Years)
    Carburettor and Central Fuel Injection (CFI) engines 1 Where fitted, the crankcase ventilation filter is located in the base of the air cleaner. 2 The filter can be renewed by pulling it out of t ...

    Underbonnet lamp - removal, refitting and bulb renewal
    1 Disconnect the battery negative lead. Removal and refitting 2 Detach the wiring connector at the left-hand bonnet hinge, and attach a length of string to the end of the wire running from the lam ...