Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Oil pump - removal and refitting.
See also:
Battery terminal check (Every 12 000 miles (20 000 km) or 12 months)
Caution: Before carrying out
any work on the vehicle battery,
read through the precautions
given in “Safety first!” at the
beginning of this manual.
1 The battery fitted as original equipment is
...
Exhaust emission control system components - removal and
refitting
Carburettor engines
Spark delay/sustain valve
Removal
1 Disconnect the vacuum lines at the valve
and remove the valve from the engine.
Refitting
2 When refitting a spark delay valve it must
be ...
Master cylinder - removal, overhaul and refitting
Note: Before starting work, refer to the
warning at the beginning of Section 3
concerning the dangers of hydraulic fluid.
Removal
1 Disconnect the leads from the level warning
switch in the reser ...
