Major operations requiring engine removal
The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.
b) Crankshaft - removal and refitting.
c) Flywheel - removal and refitting.
d) Crankshaft rear oil seal - renewal.
e) Oil pump - removal and refitting.
See also:
Bonnet lock release cable - removal and refitting
Removal
1 Working inside the vehicle, remove the
three retaining screws, and withdraw the
lower steering column shroud.
2 Remove the retaining screw, and withdraw
the release cable bracket from t ...
Auxiliary drivebelt check (Every 12 000 miles (20 000 km) or 12 months)
1 Refer to the Specifications at the beginning
of this Chapter and check the tension of each
drivebelt at the point stated. Check the full
length of each drivebelt for cracks and
deterioration. It ...
General description
The body is of welded steel construction
available in 3 or 5-door Hatchback, 3 or 5-
door Estate, soft-top Cabriolet, or Van
configurations.
The body is of monocoque construction
and is of energy ...
