Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Diagram 2a: 1986-on Lighting all models
    Diagram 2a: 1986-on Lighting all models ...

    Oil pump - removal and refitting
    Note: A suitable puller will be required to remove the crankshaft pulley. A new crankshaft pulley bolt, a new lower timing chain cover gasket, and a new oil pump gasket, must be used on refitting. ...

    Fuel pressure regulator - removal and refitting
    Note: Refer to the precautions at the end of Section 1 before proceeding. A new sealing ring will be required on refitting. Removal 1 Disconnect the battery negative lead. 2 Depressurise the fuel ...