Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Alternator drivebelt check (Every 6000 miles or 6 months)
    1 A conventional vee drivebelt is used to drive both the alternators and water pump pulleys on OHV and HCS engines, and the alternator pulley only on CVH engines, power being transmitted via a pul ...

    Seats - removal and refitting
    Front seat 1 Slide the seat fully forwards, and on seats with height adjustment unhook the tension spring from the rear crosstube. Where applicable, disconnect the wiring from the seat heating pa ...

    Master cylinder (conventional braking system) - removal, overhaul and refitting
    Note: Before commencing overhaul obtain a repair kit containing new pistons and seals. Caution: Refer to the precautions in Section 1. Removal 1 Depress the brake pedal several times to dissipat ...