Major operations requiring engine removal

The following work can only be carried out after removal of the engine from the car: a) Crankshaft main bearings - renewal.

b) Crankshaft - removal and refitting.

c) Flywheel - removal and refitting.

d) Crankshaft rear oil seal - renewal.

e) Oil pump - removal and refitting.

    See also:

    Throttle Position Sensor (TPS) - removal and refitting
    Removal 1 Disconnect the battery negative lead. 2 Unclip and disconnect the sensor wiring plug. 3 Remove the two securing screws, and withdraw the sensor from the throttle valve shaft (see illus ...

    Automatic transmission fluid level check (Every 12 000 miles or 12 months)
    1 The automatic transmission fluid level must be checked when the engine and transmission are at normal operating temperature; preferably after a short journey. 2 Park the car on level ground, the ...

    Engine valve clearance check (Every 12 000 miles (20 000 km) or 12 months)
    SOHC engines 1 The valve clearances must be checked with the engine cold. On carburettor models remove the air cleaner. 2 Disconnect the HT leads from the spark plugs and release them from the cl ...